Integrated Annual Report 2024-2025

5. Business continuity and disaster management plan The Company has a disaster management plan included in the offsite and onsite emergency plan. Offsite emergency rehearsals as per the plan are conducted at periodic intervals decided by external authorities at Ankleshwar, Atul and Tarapur sites. 6. Significant adverse impact to the environment, arising from the value chain and their mitigation or adaptation measures There is no significant adverse impact to the environment arising from the value chain of the Company. 7. Percentage of value chain partners (by value) that were assessed for environmental impact 4. Specific initiatives or innovative technologies or solutions undertaken to improve resource efficiency or reduce impact due to emissions | effluent discharge | waste generation Initiative undertaken Details of the initiative Outcome of the initiative Development of a green belt around plants and colonies Planted 1,25,019 trees in a mega plantation drive, Sanjeevani Planted 82,200 mangroves in 41 hectors of marshy land Sequestration of carbon Elimination of volatile organic compounds and toxic chemical exposure Equipped reactors with vents | stacks to vapour recovery systems | scrubbers Reduction in process stack emissions Enhancement of the capacity of common effluent treatment plant (CETP) Refurbished and upgraded treatment technology to improve efficiency at CETP Improvement in efficiency and operation at CETP Improvement of the effluent quality Added equipment for better treatment Decrease in COD load at ETP Revamp of effluent collection and transfer from source to ETP Segregated acidic and basic effluent streams from the source Decrease in effluent load at CETP Elimination of high TDS load on effluent treatment plant Installed separate MEE for the high TDS effluent from the identified plant Decrease in TDS load at ETP Elimination of contaminated water run-off Constructed storm water pit with pumping and pH meter facility to transfer to effluent treatment plants Reduction in chances of contaminated water run-off Improvement of effluent quality Developed bio-treatment process Decrease in phenolics and COD load at ETP Elimination of sewage treatment load on CETP Installed new 100 kLD sewage treatment plant Reduction in effluent load at CETP Development of containment facility for effluent transfer line Set up above ground effluent network with secondary containment at west site Elimination of risk of loss of containment for effluent transfer line 93% Integrated Annual Report 2024-25 124

RkJQdWJsaXNoZXIy MjA2MDI2